TDI-Brooks'
R/V POWELL Completes Pre-Drill Environmental Baseline Surveys
in Nigeria
During 2006, TDI-Brooks using the R/V JW POWELL completed
additional pre-drill environmental baseline survey (EBS) cruises
in Nigeria for Chevron (OPL-247) Petrobras (OPL-315), Statoil
(OPL-218) and SHELL through FugroNigeria in OPL-245, 322 and
Block H, respectively. Figure 1 shows an updated map
of all the pre- and post-drill EBSs that TDI-Brooks has conducted
offshore Nigeria using the R/V GEOEXPLORER and R/V JW POWELL
over the last three years. Our vessels have conducted virtually
all the deep water EBSs in Nigeria over the last four (4)
years.

Figure 1.
Pre- and post-drill EBSs conducted by the R/V GEOEXPLORER
and R/V JW POWELL in the 2003 to 2006 time period.
The pre- and post-drill EBSs involve the following sampling
techniques:
- Grab sampling or box coring for
infauna, chemical contaminants and ancillary parameters
(Figure 2)
- Water column sampling with a CTD
/ Rosette for water column measurements (dissolved oxygen,
nutrients, TSS, chlorophyll, etc.) (Figure 3)
- Phyto and zooplankton tows (Figure
4); and
- Air sampling.

Figure 2.
A. Grab sampler being deployed from the starboard A-Frame
on the R/V GEOEXPLORER. B. Sampling of the sediment from
the grab sampler.

Figure 3. Deployment
of the CTD / Rosette package for water column studies.

Figure 4. Plankton
tow being processed on the back deck.
Additional details on the R/V
JW POWELL or TDI-Brooks Int'l Inc. can be found at www.tdi-bi.com.
|